AP/9/2/1/23
Reference code
AP/9/2/1/23
Date
Oct 1981-Apr 1988
Scope and content
Architectural; services; roof steelwork; design studies; integrated design - includes ventilation; floor tiling; ceilings. 64 drawings, A1 size, 8 drawings, A3 size.
Zone/Location
Zone 3
Hall B and West Corridor
floor
ceiling, roof
Zone/Location
Zone 3
Hall B and West Corridor
floor
ceiling, roof
